Main Oil Pipelines System

The system of Ukraine’s main oil pipelines includes 19 oil pipelines having the diameter of 1,220 mm inclusive, the total length of 3,506.6 km, and the one-line total length of 4,767.1 km, oil pumping stations (OPS) and the Pivdennyi Sea Oil Terminal.

Read More
"Ukrtransnafta" statistics

The incoming capacity of the system is 114 million tons per year; the outgoing capacity is 56.3 million tons per year. The performance of 51 OPS is provided by 176 pumping units.

From the beginning of the year it was transported:
Transit

  mln ton

OPC of Ukraine

  mln ton

2017-09-24
2017-10-02
10.116
10.440
2017-09-24
2017-10-02
1.454
1.483
Management
Director General
Mykola Mykolaiovych Havrylenko
Director General
First Deputy Director General, Member of the Directorate
Andrii Petrovych Pasishnyk
First Deputy Director General, Member of the Directorate
Member of the Directorate
Ihor Yuriiovych Kost
Member of the Directorate
Member of the Directorate
Vitalii Viktorovych Mykhailo
Member of the Directorate
Branches
Main Pipelines «Druzhba»
The transit of oil through the main pipelines to the European countries subject to the preservation of the qualitative and quantitative properties.
Prydniprovski Main Pipelines
The transportation of oil through the main pipelines to the Kremenchuk Oil Processing Plant subject to the preservation of the qualitative and quantitative properties.
PIVDENNI MAIN PIPELINES
The transportation of oil to the Kremenchuk Oil Processing Plant, Odesa and Yuzhnyi ports subject to the preservation of the qualitative and quantitative properties.
PURCHASE OF GOODS,
WORK AND SERVICES